Draft Second Supplemental Environmental Impact Report
Great Park Neighborhoods 
Revision to the Heritage Fields Project at the Former MCAS – El Toro site

Project Location
Major portions of the Former Marine Corps Air Station (MCAS) El Toro in Planning Areas 30 & 51; surrounding the Orange County Great Park

 


Project Hearing Body
Pending; Estimated hearing timeframe – Fall 2013

Information Contact

Barry Curtis, Manager of Planning Services
(949) 724-7453 bcurtis@cityofirvine.org

 

 

 

Great Park Neighborhoods Revision to Heritage Fields
Section UL
1.00 Cover and Table of Contents
2.01 Executive Summary
3.02 Introduction
4.03 Project Description
5.04 Environmental Setting
6.05.01 Aesthetics
7.05.02 Agriculture
8.05.03 Air Quality
9.05.04 Greenhouse Gas Emissions
10.05.05 Hazards and Hazardous Materials
11.05.06 Hydrology and Water Quality
12.05.07 Land Use and Planning
13.05.08 Noise
14.05.09 Population and Housing
15.05.10 Public Services
16.05.11 Recreation
17.05.12 Transportation and Traffic
18.05.13 Utilities and Service Systems
19.06 Significant Unavoidable Adverse Impacts
20.07 Alternatives to the Modified Project
21.08 Impacts Found Not to Be Significant
22.09 Significant Irreversible Changes Due to the Modified Project
23.10 Growth-Inducing Impacts of the Modified Project
24.11 Organizations and Persons Consulted
25.12 Qualifications of Persons Preparing the SEIR
26.13 Bibliography
Great Park Neighborhoods-DRAFT SSEIR
Section UL
1._Cover and Table of Contents
2.1 Executive Summary
3.2 Introduction
4.3 Project Description
5.4 Environmental Setting
6.5.1 Aesthetics
7.5.10 Recreation
8.5.11 Transportation and Traffic
9.5.12 Utilities and Service Systems
10.5.2 Air Quality
11.5.3 Greenhouse Gas Emissions
12.5.4 Hazards and Hazardous Materials
13.5.5 Hydrology and Water Quality
14.5.6 Land Use and Planning
15.5.7 Noise
16.5.7 Noise
17.5.8 Population and Housing
18.5.9 Public Services
19.6 Significant Unavoidable Adverse Impacts
20.7 Alternatives to the Modified Project
21.8 Impacts Found Not to Be Significant
22.9 Significant Irreversible Changes Due to the Modified Project
23.9.1 Growth-Inducing Impacts of the Modified Project
24.9.2 Organizations and Persons Consulted
25.9.3 Qualifications of Persons Preparing the SEIR
26.9.4 Bibliography
Great Park DSSEIR Appendices
Section UL
1.A - NOP and Initial Study
2.B - NOP Responses
3.C - Air Quality Technical Report - 1
4.C - Air Quality Technical Report - 2
5.C - Air Quality Technical Report - 3
6.D - GHG Technical Report - 1
7.D - GHG Technical Report - 2
8.D - GHG Technical Report - 3
9.E - Hydrology Study - 1
10.E - Hydrology Study - 2
11.F - Water Quality Technical Report
12.G - Noise Technical Report - 1
13.G - Noise Technical Report - 2
14.H - Public Services Correspondence
15.I - Traffic Impact Analysis - 1
16.J - Sewer and Water Master Plan Study
17.K - 2011 SAMP Update - 1
18.K - 2011 SAMP Update - 2
19.L - Water Supply Assessment
20.M - Geology and Seismicity Update
21.N - Bio Tech Report for WLC Relocation
22.O - Relocated Wildlife Feature - Light and Noise Memo
Great Park FSSEIR Appendices
Section UL
1.A1 - Proposed GP Amendments
2.B1 - Proposed Zone Changes
3.B2 - Land Use Matrix Table
4.C1 - Irvine Wildlife Corridor Plan
5.D1 - Updated Traffic Study
6.D2 - Updated Traffic Study Appendices
7.E1 - Response Letter to Traffic Comments
8.F0 - cover sheets
9.F1 - Supplemental Noise Analysis Info
10.G1 - Updated WQ Technical Report
11.H1 - Updated Sewer and Water MP Study
12.I1 - High School Alternative
13.I2 - Traffic Evaluation Memo
14.I3 - Traffic Evaluation Memo_attachment